Triple

T20315152
Position Surface form Disambiguated ID Type / Status
Subject Southern Electric E510359 entity
Predicate instanceOf P0 FINISHED
Object regional electricity company C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional electricity company
Context triple: [Southern Electric, instanceOf, regional electricity company]
  • A. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • B. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • C. regional transmission organization
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • D. energy supplier
    An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
  • E. utilities company
    A utilities company is an organization that provides essential public services such as electricity, gas, water, or telecommunications to residential, commercial, and industrial customers, typically under government regulation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
Created at: April 16, 2026, 11:19 a.m.