Triple

T20315133
Position Surface form Disambiguated ID Type / Status
Subject Scottish Hydro-Electric E510358 entity
Predicate parentCompanyAfterPrivatisation P5441 FINISHED
Object Scottish Hydro-Electric plc NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Scottish Hydro-Electric plc | Statement: [Scottish Hydro-Electric, parentCompanyAfterPrivatisation, Scottish Hydro-Electric plc]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Scottish Hydro-Electric plc
Context triple: [Scottish Hydro-Electric, parentCompanyAfterPrivatisation, Scottish Hydro-Electric plc]
  • A. Scottish Hydro-Electric chosen
    Scottish Hydro-Electric was a major Scottish electricity generation and distribution company that became one of the core predecessors of today’s SSE plc.
  • B. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • C. Scottish and Southern Energy plc
    Scottish and Southern Energy plc is a major UK-based energy company involved in the generation, transmission, distribution, and supply of electricity and gas, as well as related energy services.
  • D. South of Scotland Electricity Board
    The South of Scotland Electricity Board was a regional public utility responsible for generating and distributing electricity across southern Scotland before the privatization of the UK electricity industry.
  • E. ScottishPower
    ScottishPower is a major UK-based energy company that generates, transmits, and supplies electricity and gas, and is part of the Iberdrola group.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: parentCompanyAfterPrivatisation
Context triple: [Scottish Hydro-Electric, parentCompanyAfterPrivatisation, Scottish Hydro-Electric plc]
  • A. parentCompanyAfterMerger
    Indicates that one company is the resulting parent company of another following a merger.
  • B. ownedByAfterNationalisation
    Indicates that an entity became owned by another entity as a result of a nationalisation process occurring after a specified point in time.
  • C. parentCompanyAfterRebranding
    Indicates that one company serves as the parent company of another specifically after the latter has undergone a rebranding.
  • D. laterParentCompany chosen
    Indicates that one entity became the parent company of another entity at a later point in time, after some prior state or relationship.
  • E. formerParentCompany
    Indicates that one entity previously served as the parent company of another but no longer holds that status.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4c7491c8190961113c4283b10b0 completed April 16, 2026, 10:07 a.m.
NER Named-entity recognition batch_69e67786f4dc8190b02a6c2a4338362d completed April 20, 2026, 6:59 p.m.
PD Predicate disambiguation batch_69e55b21b09081909e46691b6f45a07f completed April 19, 2026, 10:45 p.m.
Created at: April 16, 2026, 11:19 a.m.