Triple
T20315119
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scottish Hydro-Electric |
E510358
|
entity |
| Predicate | formedFrom |
P402
|
FINISHED |
| Object | North of Scotland Hydro-Electric Board |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North of Scotland Hydro-Electric Board | Statement: [Scottish Hydro-Electric, formedFrom, North of Scotland Hydro-Electric Board]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North of Scotland Hydro-Electric Board Context triple: [Scottish Hydro-Electric, formedFrom, North of Scotland Hydro-Electric Board]
-
A.
Scottish Hydro-Electric
Scottish Hydro-Electric was a major Scottish electricity generation and distribution company that became one of the core predecessors of today’s SSE plc.
-
B.
South of Scotland Electricity Board
The South of Scotland Electricity Board was a regional public utility responsible for generating and distributing electricity across southern Scotland before the privatization of the UK electricity industry.
-
C.
Aviemore Power Station
Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
-
D.
Rannoch power station
Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
-
E.
Huntly Power Station
Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: North of Scotland Hydro-Electric Board Target entity description: The North of Scotland Hydro-Electric Board was a public authority responsible for developing and supplying hydroelectric power and electricity infrastructure across the Highlands and Islands of Scotland in the mid-20th century.
-
A.
Scottish Hydro-Electric
chosen
Scottish Hydro-Electric was a major Scottish electricity generation and distribution company that became one of the core predecessors of today’s SSE plc.
-
B.
South of Scotland Electricity Board
The South of Scotland Electricity Board was a regional public utility responsible for generating and distributing electricity across southern Scotland before the privatization of the UK electricity industry.
-
C.
Aviemore Power Station
Aviemore Power Station is a major hydroelectric power facility in New Zealand, located on the Waitaki River as part of the Waitaki hydroelectric scheme.
-
D.
Rannoch power station
Rannoch power station is a hydroelectric power facility in the Scottish Highlands that forms part of the Tummel Valley hydroelectric scheme operated by SSE.
-
E.
Huntly Power Station
Huntly Power Station is New Zealand’s largest thermal power station, a major coal- and gas-fired electricity generation facility located near the town of Huntly in the Waikato region.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0b4c7491c8190961113c4283b10b0 |
completed | April 16, 2026, 10:07 a.m. |
| NER | Named-entity recognition | batch_69e67786f4dc8190b02a6c2a4338362d |
completed | April 20, 2026, 6:59 p.m. |
Created at: April 16, 2026, 11:19 a.m.