Triple

T20281944
Position Surface form Disambiguated ID Type / Status
Subject Llangennech E503169 entity
Predicate locatedOn P40 FINISHED
Object River Loughor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Loughor | Statement: [Llangennech, locatedOn, River Loughor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Loughor
Context triple: [Llangennech, locatedOn, River Loughor]
  • A. River Loughor chosen
    River Loughor is a river in South Wales that flows through Carmarthenshire and Swansea before emptying into the Loughor estuary along the northern side of the Gower Peninsula.
  • B. Loughor
    Loughor is a small town in Swansea, Wales, historically known as a port and industrial settlement near the Loughor estuary.
  • C. Ogmore River
    The Ogmore River is a river in South Wales that flows through the Vale of Glamorgan to the Bristol Channel near the village of Ogmore-by-Sea.
  • D. Penryn River
    Penryn River is a tidal creek and estuarine waterway in Cornwall, England, that flows into Falmouth Harbour and is known for its maritime and boating activities.
  • E. River Lerryn
    River Lerryn is a small tidal river in Cornwall, England, known for flowing through the village of Lerryn before joining the River Fowey estuary.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0b4b0e79c8190bd61f22ef1329fa8 completed April 16, 2026, 10:06 a.m.
NER Named-entity recognition batch_69e6768f86448190842389a98b93a918 completed April 20, 2026, 6:55 p.m.
Created at: April 16, 2026, 10:39 a.m.