Triple

T20262484
Position Surface form Disambiguated ID Type / Status
Subject Bhavani River E498878 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Kundah Hydroelectric Scheme NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kundah Hydroelectric Scheme | Statement: [Bhavani River, hasHydroelectricProject, Kundah Hydroelectric Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kundah Hydroelectric Scheme
Context triple: [Bhavani River, hasHydroelectricProject, Kundah Hydroelectric Scheme]
  • A. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • D. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • E. Idamalayar Hydroelectric Project
    Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kundah Hydroelectric Scheme
Target entity description: Kundah Hydroelectric Scheme is a major hydroelectric power project in the Nilgiri Hills of Tamil Nadu, India, utilizing the waters of the Bhavani River and its tributaries to generate electricity.
  • A. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • D. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • E. Idamalayar Hydroelectric Project
    Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6275fa6c8190952924930adee150 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e674cba2748190a886ecd8316dc518 completed April 20, 2026, 6:47 p.m.
Created at: April 11, 2026, 11:41 p.m.