Triple
T20262484
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bhavani River |
E498878
|
entity |
| Predicate | hasHydroelectricProject |
P15311
|
FINISHED |
| Object | Kundah Hydroelectric Scheme |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kundah Hydroelectric Scheme | Statement: [Bhavani River, hasHydroelectricProject, Kundah Hydroelectric Scheme]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kundah Hydroelectric Scheme Context triple: [Bhavani River, hasHydroelectricProject, Kundah Hydroelectric Scheme]
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Bhadra Hydel Project
Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
-
E.
Idamalayar Hydroelectric Project
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kundah Hydroelectric Scheme Target entity description: Kundah Hydroelectric Scheme is a major hydroelectric power project in the Nilgiri Hills of Tamil Nadu, India, utilizing the waters of the Bhavani River and its tributaries to generate electricity.
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Bhadra Hydel Project
Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
-
C.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
-
D.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
-
E.
Idamalayar Hydroelectric Project
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6275fa6c8190952924930adee150 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e674cba2748190a886ecd8316dc518 |
completed | April 20, 2026, 6:47 p.m. |
Created at: April 11, 2026, 11:41 p.m.