Triple
T20220653
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harbaksfjellet wind farm |
E495243
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | onshore wind power plant |
C9379
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: onshore wind power plant Context triple: [Harbaksfjellet wind farm, instanceOf, onshore wind power plant]
-
A.
wind power plant
chosen
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
B.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
C.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
-
D.
wind power company
A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
-
E.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626cff80819097b530718a7c98b6 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:39 p.m.