Triple
T20213579
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barddhaman Junction |
E493553
|
entity |
| Predicate | onLine |
P1293
|
FINISHED |
| Object | Barddhaman–Rampurhat line |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barddhaman–Rampurhat line | Statement: [Barddhaman Junction, onLine, Barddhaman–Rampurhat line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Barddhaman–Rampurhat line Context triple: [Barddhaman Junction, onLine, Barddhaman–Rampurhat line]
-
A.
Barddhaman–Katwa line
The Barddhaman–Katwa line is a railway route in West Bengal, India, connecting Barddhaman with Katwa and serving as an important regional commuter and freight corridor.
-
B.
Naihati–Ranaghat line
The Naihati–Ranaghat line is a suburban railway corridor in West Bengal, India, forming part of the Kolkata Suburban Railway network and connecting key towns along the Hooghly and Nadia districts.
-
C.
Howrah–Adra–Chakradharpur line
The Howrah–Adra–Chakradharpur line is a major railway route in eastern India that connects Howrah in West Bengal with Chakradharpur in Jharkhand via Adra, serving as an important corridor for both passenger and freight traffic.
-
D.
Bandel–Katwa line
The Bandel–Katwa line is a suburban and regional railway corridor in West Bengal, India, connecting Bandel with Katwa and serving numerous towns and rural areas along the Hooghly and Burdwan districts.
-
E.
Kharagpur–Digha line
The Kharagpur–Digha line is a railway route in eastern India that connects the major junction of Kharagpur with the coastal resort town of Digha, serving both local commuters and tourists.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Barddhaman–Rampurhat line Target entity description: The Barddhaman–Rampurhat line is a railway route in the Indian state of West Bengal that connects Barddhaman with Rampurhat, serving as an important regional passenger and freight corridor.
-
A.
Barddhaman–Katwa line
The Barddhaman–Katwa line is a railway route in West Bengal, India, connecting Barddhaman with Katwa and serving as an important regional commuter and freight corridor.
-
B.
Naihati–Ranaghat line
The Naihati–Ranaghat line is a suburban railway corridor in West Bengal, India, forming part of the Kolkata Suburban Railway network and connecting key towns along the Hooghly and Nadia districts.
-
C.
Howrah–Adra–Chakradharpur line
The Howrah–Adra–Chakradharpur line is a major railway route in eastern India that connects Howrah in West Bengal with Chakradharpur in Jharkhand via Adra, serving as an important corridor for both passenger and freight traffic.
-
D.
Bandel–Katwa line
The Bandel–Katwa line is a suburban and regional railway corridor in West Bengal, India, connecting Bandel with Katwa and serving numerous towns and rural areas along the Hooghly and Burdwan districts.
-
E.
Kharagpur–Digha line
The Kharagpur–Digha line is a railway route in eastern India that connects the major junction of Kharagpur with the coastal resort town of Digha, serving both local commuters and tourists.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6269614c8190bb40475d9d477358 |
completed | April 11, 2026, 3:02 p.m. |
| NER | Named-entity recognition | batch_69e66ed6fe888190b553ba6879cb2d8d |
completed | April 20, 2026, 6:22 p.m. |
Created at: April 11, 2026, 11:38 p.m.