Triple

T20190388
Position Surface form Disambiguated ID Type / Status
Subject Varia Suit E492965 entity
Predicate instanceOf P0 FINISHED
Object Equipment upgrade C26350 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Equipment upgrade
Context triple: [Varia Suit, instanceOf, Equipment upgrade]
  • A. fighter aircraft upgrade configuration
    A fighter aircraft upgrade configuration is a defined set of modifications, systems, and software enhancements applied to an existing fighter platform to improve its performance, capabilities, survivability, or mission adaptability.
  • B. operating system enhancement pack
    An operating system enhancement pack is a collection of add-on tools, features, and optimizations designed to extend and improve the functionality, performance, and usability of an existing operating system.
  • C. feature update chosen
    A feature update is a modification or enhancement to an existing product or system that adds new capabilities, improves performance, or refines current functionality.
  • D. network upgrade initiative
    A network upgrade initiative is a coordinated project to enhance an organization’s network infrastructure, capacity, performance, and security to meet current and future business needs.
  • E. video game expansion
    A video game expansion is an add-on product that builds upon an existing game by introducing new content such as storylines, areas, characters, items, or gameplay features to extend and enhance the original experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6268a034819081cbd9ea5a1c9475 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 11:37 p.m.