Triple
T20189524
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fábrica La Aurora |
E492946
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | art and design center |
C16992
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: art and design center Context triple: [Fábrica La Aurora, instanceOf, art and design center]
-
A.
art centre
An art centre is a dedicated venue or institution that hosts, supports, and promotes the creation, exhibition, and education of visual, performing, and other contemporary arts for the public.
-
B.
visual arts center
chosen
A visual arts center is a dedicated facility that supports the creation, exhibition, education, and appreciation of visual art through studios, galleries, classrooms, and community programs.
-
C.
art studio
An art studio is a dedicated space equipped with tools, materials, and appropriate lighting where artists create, experiment with, and refine their artwork.
-
D.
art gallery organization
An art gallery organization is an entity that curates, manages, and presents artworks and exhibitions while coordinating artists, spaces, and audiences to support cultural engagement and art commerce.
-
E.
contemporary art gallery
A contemporary art gallery is a curated space that exhibits, promotes, and often sells innovative, current artworks across diverse media by living or recently active artists.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da6268a034819081cbd9ea5a1c9475 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:37 p.m.