Triple
T2018762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | An Caighdeán Oifigiúil |
E44056
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | grammatical standard |
C4690
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: grammatical standard Context triple: [An Caighdeán Oifigiúil, instanceOf, grammatical standard]
-
A.
standard
A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
-
B.
standardized language variety
chosen
A standardized language variety is a codified form of a language that has been deliberately regulated and accepted as the norm for public, official, and educational use within a speech community.
-
C.
official standard
An official standard is an authoritative, formally approved specification or guideline established by a recognized body to ensure consistency, compatibility, and quality across products, services, or processes.
-
D.
standard accent
A standard accent is the socially accepted pronunciation pattern of a language that is widely regarded as neutral, prestigious, or correct within a particular speech community.
-
E.
academic standards
Academic standards are formal, measurable expectations that define what students should know and be able to do at specific stages of their education.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8891201bc8190aca837be6de41579 |
completed | March 4, 2026, 7:33 p.m. |
Created at: March 4, 2026, 7:38 p.m.