Triple

T20185008
Position Surface form Disambiguated ID Type / Status
Subject Chicoasén Dam E492831 entity
Predicate alsoKnownAs P39 FINISHED
Object Presa Chicoasén NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Presa Chicoasén | Statement: [Chicoasén Dam, alsoKnownAs, Presa Chicoasén]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Presa Chicoasén
Context triple: [Chicoasén Dam, alsoKnownAs, Presa Chicoasén]
  • A. Chicoasén Dam chosen
    Chicoasén Dam is a major hydroelectric dam in Chiapas, Mexico, known as one of the largest power-generating facilities in the country.
  • B. Morelos Dam
    Morelos Dam is a diversion dam on the lower Colorado River near the U.S.–Mexico border that channels water primarily for agricultural use in Mexico.
  • C. Presa Álvaro Obregón
    Presa Álvaro Obregón is a major reservoir and hydroelectric dam on the Yaqui River in Sonora, Mexico, used primarily for irrigation, water supply, and power generation.
  • D. Presa Lázaro Cárdenas
    Presa Lázaro Cárdenas is a major Mexican dam and reservoir on the Nazas River, built primarily for irrigation, flood control, and regional water supply.
  • E. San Carlos Dam
    San Carlos Dam is a major concrete gravity dam in Arizona that creates San Carlos Lake and provides irrigation water, flood control, and hydroelectric power along the Gila River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6268a034819081cbd9ea5a1c9475 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e668f199688190a42094cce220f6f2 completed April 20, 2026, 5:57 p.m.
Created at: April 11, 2026, 11:36 p.m.