Triple

T20179075
Position Surface form Disambiguated ID Type / Status
Subject Chicago, Burlington and Quincy Railroad E492677 entity
Predicate operatedRoute P18593 FINISHED
Object Chicago–Omaha NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chicago–Omaha | Statement: [Chicago, Burlington and Quincy Railroad, operatedRoute, Chicago–Omaha]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chicago–Omaha
Context triple: [Chicago, Burlington and Quincy Railroad, operatedRoute, Chicago–Omaha]
  • A. Cleveland–St. Louis
    Cleveland–St. Louis was a principal intercity rail corridor in the Midwestern United States that connected Cleveland, Ohio, with St. Louis, Missouri.
  • B. Buffalo–Cleveland–Chicago
    Buffalo–Cleveland–Chicago refers to a major intercity rail corridor in the Great Lakes region that connected these three cities as part of a key route of the New York, Chicago and St. Louis Railroad.
  • C. St. Louis–Dallas
    St. Louis–Dallas refers to the intercity rail corridor linking St. Louis, Missouri, with Dallas, Texas, historically served by passenger trains such as the Texas Special.
  • D. Pittsburgh–St. Louis
    Pittsburgh–St. Louis refers to the intercity rail corridor linking Pittsburgh, Pennsylvania, with St. Louis, Missouri, historically used by major Midwestern and Eastern railroads.
  • E. Chicago and Milwaukee
    Chicago and Milwaukee are two major Midwestern U.S. cities located along the southwestern shore of Lake Michigan, known for their cultural, economic, and historical significance.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chicago–Omaha
Target entity description: Chicago–Omaha was a key Midwestern rail corridor linking Chicago, Illinois, with Omaha, Nebraska, and serving as an important route for both passenger and freight traffic.
  • A. Cleveland–St. Louis
    Cleveland–St. Louis was a principal intercity rail corridor in the Midwestern United States that connected Cleveland, Ohio, with St. Louis, Missouri.
  • B. Buffalo–Cleveland–Chicago
    Buffalo–Cleveland–Chicago refers to a major intercity rail corridor in the Great Lakes region that connected these three cities as part of a key route of the New York, Chicago and St. Louis Railroad.
  • C. St. Louis–Dallas
    St. Louis–Dallas refers to the intercity rail corridor linking St. Louis, Missouri, with Dallas, Texas, historically served by passenger trains such as the Texas Special.
  • D. Pittsburgh–St. Louis
    Pittsburgh–St. Louis refers to the intercity rail corridor linking Pittsburgh, Pennsylvania, with St. Louis, Missouri, historically used by major Midwestern and Eastern railroads.
  • E. Chicago and Milwaukee
    Chicago and Milwaukee are two major Midwestern U.S. cities located along the southwestern shore of Lake Michigan, known for their cultural, economic, and historical significance.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da6268a034819081cbd9ea5a1c9475 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e668ed07c8819091bd9ffda237a91c completed April 20, 2026, 5:57 p.m.
Created at: April 11, 2026, 11:36 p.m.