Triple

T20134813
Position Surface form Disambiguated ID Type / Status
Subject Autry Court E490996 entity
Predicate namedAfter P63 FINISHED
Object Mrs. James L. Autry NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mrs. James L. Autry | Statement: [Autry Court, namedAfter, Mrs. James L. Autry]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mrs. James L. Autry
Context triple: [Autry Court, namedAfter, Mrs. James L. Autry]
  • A. Mrs. James L. Autry chosen
    Mrs. James L. Autry was a prominent local figure and benefactor in the community whose contributions led to a sports arena, Autry Court, being named in her honor.
  • B. Mrs. Robert W. Hayler
    Mrs. Robert W. Hayler was the woman who ceremonially sponsored the U.S. Navy submarine USS Apogon at its launching.
  • C. Mrs. Thomas Holcomb
    Mrs. Thomas Holcomb was the woman who sponsored and christened the U.S. Navy submarine USS Drum (SS-228) at its launching.
  • D. Mrs. J. N. Keitt
    Mrs. J. N. Keitt was the Florida grower after whom the well-known late-season Keitt mango cultivar was named.
  • E. Nellie W. Carter
    Nellie W. Carter was the mother of American actor and entertainer Mickey Rooney.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da62651a0c8190a3e05e95e056a66b completed April 11, 2026, 3:01 p.m.
NER Named-entity recognition batch_69e66766e46c81908721fd47066dc9f8 completed April 20, 2026, 5:50 p.m.
Created at: April 11, 2026, 11:32 p.m.