Triple

T2012969
Position Surface form Disambiguated ID Type / Status
Subject Gwynt y Môr Wind Farm E43730 entity
Predicate instanceOf P0 FINISHED
Object wind power facility C7975 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wind power facility
Context triple: [Gwynt y Môr Wind Farm, instanceOf, wind power facility]
  • A. windmill
    A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
  • B. water-powered mill
    A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
  • C. wind tunnel
    A wind tunnel is a controlled testing facility where air is driven past stationary objects to study aerodynamic properties such as lift, drag, and flow behavior.
  • D. fusion energy research facility
    A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
  • E. Dutch windmill
    A Dutch windmill is a traditional tower-like structure with large rotating sails used historically in the Netherlands to harness wind power for milling grain, pumping water, and other mechanical tasks.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88716e9f08190946313fdc949e3cf completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:37 p.m.