Triple
T201293
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Autoport |
E4509
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | port facility |
C82
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: port facility Context triple: [Autoport, instanceOf, port facility]
-
A.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
B.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
C.
diplomatic facility
A diplomatic facility is a building or complex used by a nation or international organization to conduct official diplomatic activities, house diplomatic staff, and provide consular services in a host country.
-
D.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
-
E.
transport hub
chosen
A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25737567c81908f9c505300239181 |
completed | Feb. 28, 2026, 2:47 a.m. |
Created at: Feb. 28, 2026, 2:51 a.m.