Triple
T20101751
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | الحديدة |
E496560
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | مركز تجاري |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: مركز تجاري Context triple: [الحديدة, instanceOf, مركز تجاري]
-
A.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
commercial park
A commercial park is a planned area of land developed with multiple business facilities—such as offices, retail spaces, and light industrial units—designed to support commercial activities within a cohesive, often landscaped environment.
-
C.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
D.
Commercial area
A commercial area is a designated zone within a city or region primarily used for business activities such as retail, offices, services, and entertainment.
-
E.
commercial and residential complex
A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69da626eee3881909f3454986d4a6511 |
completed | April 11, 2026, 3:02 p.m. |
Created at: April 11, 2026, 11:27 p.m.