Triple

T20087838
Position Surface form Disambiguated ID Type / Status
Subject Port of Rijeka E496182 entity
Predicate hasRoadConnectionTo P11435 FINISHED
Object Croatian motorway network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Croatian motorway network | Statement: [Port of Rijeka, hasRoadConnectionTo, Croatian motorway network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Croatian motorway network
Context triple: [Port of Rijeka, hasRoadConnectionTo, Croatian motorway network]
  • A. Croatian A6 motorway
    The Croatian A6 motorway is a major highway in Croatia that forms a key part of the route connecting the capital Zagreb with the coastal city of Rijeka, traversing the mountainous Gorski Kotar region.
  • B. Hrvatske ceste
    Hrvatske ceste is the state-owned company responsible for managing and maintaining Croatia’s national road network.
  • C. Croatian railway network
    The Croatian railway network is the national rail system of Croatia, centered on Zagreb and connecting major cities and regions domestically and with neighboring countries.
  • D. Zagreb–Split corridor
    The Zagreb–Split corridor is a major Croatian transport route linking the capital city Zagreb with the coastal city of Split, serving as a key connection between inland and Adriatic regions.
  • E. Zagreb–Rijeka corridor
    The Zagreb–Rijeka corridor is a major Croatian transport route linking the inland capital region around Zagreb with the Adriatic port city of Rijeka, serving as a key axis for national and international traffic and trade.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Croatian motorway network
Target entity description: The Croatian motorway network is an extensive system of high-speed roads that connects major cities, ports, and tourist regions across Croatia and links the country to neighboring European states.
  • A. Croatian A6 motorway
    The Croatian A6 motorway is a major highway in Croatia that forms a key part of the route connecting the capital Zagreb with the coastal city of Rijeka, traversing the mountainous Gorski Kotar region.
  • B. Hrvatske ceste
    Hrvatske ceste is the state-owned company responsible for managing and maintaining Croatia’s national road network.
  • C. Croatian railway network
    The Croatian railway network is the national rail system of Croatia, centered on Zagreb and connecting major cities and regions domestically and with neighboring countries.
  • D. Zagreb–Split corridor
    The Zagreb–Split corridor is a major Croatian transport route linking the capital city Zagreb with the coastal city of Split, serving as a key connection between inland and Adriatic regions.
  • E. Zagreb–Rijeka corridor
    The Zagreb–Rijeka corridor is a major Croatian transport route linking the inland capital region around Zagreb with the Adriatic port city of Rijeka, serving as a key axis for national and international traffic and trade.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626eee3881909f3454986d4a6511 completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6655c7de081909a400c736e92495d completed April 20, 2026, 5:41 p.m.
Created at: April 11, 2026, 11:16 p.m.