Triple

T20076540
Position Surface form Disambiguated ID Type / Status
Subject New River Water Trail E499881 entity
Predicate instanceOf P0 FINISHED
Object water trail C40354 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water trail
Context triple: [New River Water Trail, instanceOf, water trail]
  • A. national water trail
    A national water trail is a designated waterway route recognized for its recreational, scenic, and conservation value, providing public access and facilities for activities like paddling, boating, and wildlife viewing.
  • B. river rapids
    River rapids are fast-flowing, turbulent sections of a river where water rushes over obstacles and steep gradients, creating waves, eddies, and whitewater.
  • C. waterfront greenway
    A waterfront greenway is a linear, publicly accessible open space along a body of water that combines pedestrian and bicycle paths with landscaping, recreation areas, and ecological features to connect communities and enhance shoreline environments.
  • D. waterway feature chosen
    A waterway feature is any natural or man-made linear or areal element that involves the presence, movement, or containment of water, such as rivers, canals, streams, or channels.
  • E. trout stream
    A trout stream is a cold, clean, well-oxygenated flowing body of water that provides suitable habitat for trout to live, feed, and reproduce.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627770948190997f486f9a2e370f completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:40 p.m.