Triple

T20075449
Position Surface form Disambiguated ID Type / Status
Subject Mineta San José International Airport (flight path area) E499850 entity
Predicate instanceOf P0 FINISHED
Object approach and departure corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: approach and departure corridor
Context triple: [Mineta San José International Airport (flight path area), instanceOf, approach and departure corridor]
  • A. highway approach route
    A highway approach route is a roadway segment or path that guides vehicles from local or arterial roads onto a highway, facilitating safe and efficient merging into higher-speed traffic.
  • B. airport runway
    An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
  • C. roadway approach
    A roadway approach is the segment of a road leading up to an intersection, junction, or control device, where vehicles transition from through movement to potential stopping, turning, or yielding maneuvers.
  • D. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • E. passenger terminal concourse
    A passenger terminal concourse is a large, central circulation space within a transport terminal where travelers move between entrances, ticketing, security, and boarding areas, often containing seating, retail, and information services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627770948190997f486f9a2e370f completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:40 p.m.