Triple

T20047359
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 395 Business (Adams County, Washington) E497596 entity
Predicate instanceOf P0 FINISHED
Object United States Numbered Highway business loop C8195 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States Numbered Highway business loop
Context triple: [U.S. Route 395 Business (Adams County, Washington), instanceOf, United States Numbered Highway business loop]
  • A. Interstate business loop
    An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
  • B. U.S. Highway business route chosen
    A U.S. Highway business route is a special alignment of a U.S. Highway that diverts from the main route to pass through the downtown or commercial center of a city or town, providing local access to businesses and services.
  • C. U.S. Numbered Highway
    A U.S. Numbered Highway is a nationally coordinated, signed roadway within the United States that is part of the United States Numbered Highway System, providing intercity and interstate connections but distinct from the Interstate Highway System.
  • D. Farm to Market Road
    A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
  • E. Interstate Highway
    An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627278c88190babe4297a9df1236 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:37 p.m.