Triple
T2004299
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Marble Palace |
E43545
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | museum branch |
C7951
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: museum branch Context triple: [Marble Palace, instanceOf, museum branch]
-
A.
museum infrastructure
Museum infrastructure encompasses the physical, technological, and organizational systems that support the preservation, display, security, and visitor experience of a museum’s collections and activities.
-
B.
museum curatorial department
The museum curatorial department is responsible for researching, selecting, acquiring, interpreting, and overseeing the care and presentation of the museum’s collections and exhibitions.
-
C.
museum exhibition
A museum exhibition is a curated public display of objects, artifacts, or artworks organized around a specific theme, narrative, or concept to educate and engage visitors.
-
D.
art museum
An art museum is a public or private institution that collects, preserves, studies, and exhibits works of art for education, inspiration, and cultural enrichment.
-
E.
art museum wing
A dedicated section of an art museum designed to house, organize, and display a specific collection, theme, or period of artworks within the larger institution.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88715dbbc8190b2299e29e955d997 |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:37 p.m.