Triple

T20033906
Position Surface form Disambiguated ID Type / Status
Subject BIPM Circular T E497208 entity
Predicate instanceOf P0 FINISHED
Object metrology document C42777 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metrology document
Context triple: [BIPM Circular T, instanceOf, metrology document]
  • A. metrology instrument
    A metrology instrument is a precision device used to measure and quantify physical properties or dimensions to ensure accuracy, consistency, and compliance with specified standards.
  • B. measurement standardization treaty
    A measurement standardization treaty is an international agreement that establishes and harmonizes common units, definitions, and procedures for measurements to ensure consistency and comparability across participating countries.
  • C. metric
    A metric is a function that defines a distance between elements of a set, satisfying non-negativity, identity of indiscernibles, symmetry, and the triangle inequality.
  • D. metre
    A metre is a unit of poetic rhythm that organizes stressed and unstressed syllables into a recurring pattern within a line of verse.
  • E. national measurement standards laboratory
    A national measurement standards laboratory is an official institution responsible for developing, maintaining, and disseminating a country’s primary measurement standards to ensure accuracy, consistency, and international compatibility of measurements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da627278c88190babe4297a9df1236 completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:36 p.m.