Triple

T2003361
Position Surface form Disambiguated ID Type / Status
Subject Dublin Ferryport Terminals E43520 entity
Predicate instanceOf P0 FINISHED
Object roll-on/roll-off terminal C6402 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: roll-on/roll-off terminal
Context triple: [Dublin Ferryport Terminals, instanceOf, roll-on/roll-off terminal]
  • A. ferry terminal chosen
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • B. cargo vessel
    A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
  • C. multi-role tanker transport
    A multi-role tanker transport is a military aircraft designed to both refuel other aircraft in flight and carry passengers, cargo, or medical evacuees, enabling flexible air-to-air refueling and transport missions.
  • D. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • E. tanker
    A tanker is a large, specialized vessel or vehicle designed for transporting bulk liquids or gases, such as oil, chemicals, or liquefied natural gas, over long distances.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88715dbbc8190b2299e29e955d997 completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:37 p.m.