Triple

T2002309
Position Surface form Disambiguated ID Type / Status
Subject Regional At-Large Organizations E43497 entity
Predicate composedOf P402 FINISHED
Object At-Large Structures E224035 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: At-Large Structures | Statement: [Regional At-Large Organizations, composedOf, At-Large Structures]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: At-Large Structures
Context triple: [Regional At-Large Organizations, composedOf, At-Large Structures]
  • A. At-Large Structures chosen
    At-Large Structures are globally distributed groups within ICANN’s At-Large community that organize and represent the interests of individual Internet users in ICANN’s policy processes.
  • B. Structures I
    Structures I is an influential serial piano composition by Pierre Boulez that exemplifies his rigorous application of total serialism in the early 1950s.
  • C. V-Site buildings
    The V-Site buildings are historic Los Alamos structures where key work on the first atomic bombs was conducted during the Manhattan Project.
  • D. A-frame Tower
    A-frame Tower is the iconic, monorail-through-the-middle main building of Disney's Contemporary Resort at Walt Disney World.
  • E. Spiral Building
    Spiral Building is a landmark postmodern cultural and commercial complex in Tokyo designed by renowned Japanese architect Fumihiko Maki.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88715dbbc8190b2299e29e955d997 completed March 4, 2026, 7:25 p.m.
NER Named-entity recognition batch_69abb8820cec8190a945e5daeb8c9df6 completed March 7, 2026, 5:32 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae0adcd2708190b126e3872679d88c completed March 8, 2026, 11:48 p.m.
Created at: March 4, 2026, 7:37 p.m.