Triple

T20021212
Position Surface form Disambiguated ID Type / Status
Subject Ellsworth, Maine E494861 entity
Predicate hasTransportation P105 FINISHED
Object Maine State Route 179 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Maine State Route 179 | Statement: [Ellsworth, Maine, hasTransportation, Maine State Route 179]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Maine State Route 179
Context triple: [Ellsworth, Maine, hasTransportation, Maine State Route 179]
  • A. Maine State Route 179 chosen
    Maine State Route 179 is a state highway in Maine that runs generally north–south, connecting rural communities and local roads in Hancock County.
  • B. Maine State Route 177
    Maine State Route 177 is a state highway in Maine that serves as a regional connector road within the state's numbered route network.
  • C. Maine State Route 178
    Maine State Route 178 is a state highway in Maine that runs between Brewer and Milford, serving communities along the Penobscot River.
  • D. Maine State Route 170
    Maine State Route 170 is a state highway in Maine that serves as a regional connector for local communities within the state’s road network.
  • E. Maine State Route 171
    Maine State Route 171 is a state highway in Maine that serves as a local connector route within the state’s numbered highway network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623fe1988190a1c09d392d866dc8 completed April 20, 2026, 5:28 p.m.
Created at: April 11, 2026, 3:35 p.m.