Triple

T20016099
Position Surface form Disambiguated ID Type / Status
Subject Belo Monte Dam E494721 entity
Predicate gridConnection P845 FINISHED
Object Brazilian National Interconnected System NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brazilian National Interconnected System | Statement: [Belo Monte Dam, gridConnection, Brazilian National Interconnected System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brazilian National Interconnected System
Context triple: [Belo Monte Dam, gridConnection, Brazilian National Interconnected System]
  • A. Brazilian National Interconnected System chosen
    The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
  • B. South American power grid
    The South American power grid is the interconnected network of electricity generation, transmission, and distribution systems across South American countries, integrating major resources such as large hydroelectric complexes to supply power regionally.
  • C. Colombian National Interconnected System
    The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
  • D. Brazilian National Electric Energy Agency
    The Brazilian National Electric Energy Agency is the federal regulatory body responsible for overseeing and regulating Brazil’s electricity sector, including generation, transmission, distribution, and commercialization of electric power.
  • E. Furnas Centrais Elétricas
    Furnas Centrais Elétricas is a major Brazilian state-controlled electric utility company focused on the generation and transmission of hydroelectric power.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626bfd288190aa5d65098b6433ae completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e6623cb8188190b95913ffed895930 completed April 20, 2026, 5:28 p.m.
Created at: April 11, 2026, 3:34 p.m.