Triple

T20006311
Position Surface form Disambiguated ID Type / Status
Subject Oracle Advanced Pricing E494468 entity
Predicate instanceOf P0 FINISHED
Object pricing management software C14340 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pricing management software
Context triple: [Oracle Advanced Pricing, instanceOf, pricing management software]
  • A. dynamic pricing facility chosen
    A dynamic pricing facility is a system or component that automatically adjusts prices in real time based on factors such as demand, supply, customer behavior, and market conditions.
  • B. price determination model
    A price determination model is a conceptual framework that explains how the interaction of supply, demand, and market conditions leads to the establishment of prices for goods or services.
  • C. price guide
    A price guide is a reference resource that lists typical or current market values for items or services to help users estimate fair prices and make informed buying or selling decisions.
  • D. second-best pricing solution
    A second-best pricing solution is a pricing strategy that maximizes overall welfare or profit subject to real-world constraints that prevent achieving the ideal, first-best outcome.
  • E. price control law
    A price control law is a legal regulation that sets maximum or minimum prices for goods or services to influence market outcomes and protect consumers or producers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626b2d748190886981ea90c8b2ea completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:33 p.m.