Triple

T20006207
Position Surface form Disambiguated ID Type / Status
Subject Oracle Inventory E494466 entity
Predicate instanceOf P0 FINISHED
Object inventory management software C4727 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: inventory management software
Context triple: [Oracle Inventory, instanceOf, inventory management software]
  • A. product lifecycle management software
    Product lifecycle management software is an integrated digital system that manages and connects all data, processes, and stakeholders involved in a product’s journey from initial concept and design through manufacturing, service, and end-of-life.
  • B. SCM system chosen
    An SCM system (Supply Chain Management system) is a software platform that plans, executes, and monitors the end-to-end flow of goods, information, and finances across the supply chain to optimize efficiency, cost, and service levels.
  • C. cloud-based tool management solution
    A cloud-based tool management solution is a centralized, online platform that tracks, organizes, and controls access to physical and digital tools across locations in real time.
  • D. military logistics software system
    A military logistics software system is an integrated digital platform that plans, tracks, and optimizes the movement, supply, maintenance, and readiness of military resources across operations and theaters.
  • E. package management system
    A package management system is a tool that automates the processes of finding, installing, upgrading, configuring, and removing software packages and their dependencies in a consistent and reliable way.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626b2d748190886981ea90c8b2ea completed April 11, 2026, 3:02 p.m.
Created at: April 11, 2026, 3:33 p.m.