Triple

T20003715
Position Surface form Disambiguated ID Type / Status
Subject WKRefreshBackgroundTask E494396 entity
Predicate completionEffect P128015 FINISHED
Object signals to system that background refresh is done LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: signals to system that background refresh is done | Statement: [WKRefreshBackgroundTask, completionEffect, signals to system that background refresh is done]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completionEffect
Context triple: [WKRefreshBackgroundTask, completionEffect, signals to system that background refresh is done]
  • A. completionOf
    Indicates that one entity represents the finished state, fulfillment, or successful conclusion of another entity, process, or requirement.
  • B. completionBehavior chosen
    Indicates how an entity behaves or what outcome occurs when a process, task, or interaction reaches completion.
  • C. completionPeriod
    Indicates the time span within which an associated task, process, or obligation must be completed.
  • D. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • E. completionRate
    Indicates the proportion of a task, process, or set of items that has been finished relative to its total intended amount.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69da626b2d748190886981ea90c8b2ea completed April 11, 2026, 3:02 p.m.
NER Named-entity recognition batch_69e661a3ad148190918f9dce755fe470 completed April 20, 2026, 5:25 p.m.
PD Predicate disambiguation batch_69e54cdddbd48190becc8b2aa5ab4ef9 completed April 19, 2026, 9:45 p.m.
Created at: April 11, 2026, 3:33 p.m.