Triple

T1999064
Position Surface form Disambiguated ID Type / Status
Subject International Chronostratigraphic Chart E43422 entity
Predicate instanceOf P0 FINISHED
Object standard reference C4305 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: standard reference
Context triple: [International Chronostratigraphic Chart, instanceOf, standard reference]
  • A. standard
    A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
  • B. official standard chosen
    An official standard is an authoritative, formally approved specification or guideline established by a recognized body to ensure consistency, compatibility, and quality across products, services, or processes.
  • C. reference book
    A reference book is a comprehensive, systematically organized source of factual information designed to be consulted for specific topics rather than read straight through.
  • D. reference implementation
    A reference implementation is a canonical, typically straightforward version of a system or specification created to demonstrate correct behavior and serve as a standard for other implementations.
  • E. popular standard
    A popular standard is a widely adopted and commonly accepted norm, specification, or practice that has gained broad usage and recognition across a community, industry, or society.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88715dbbc8190b2299e29e955d997 completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:37 p.m.