Triple
T19957985
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Supersport motorcycle |
E479736
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-performance motorcycle |
C27501
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-performance motorcycle Context triple: [Supersport motorcycle, instanceOf, high-performance motorcycle]
-
A.
sport motorcycle
chosen
A sport motorcycle is a high-performance, lightweight motorcycle designed for speed, agility, and precise handling, typically featuring an aerodynamic riding position and powerful engine for on-road performance.
-
B.
supermoto-style motorcycle
A supermoto-style motorcycle is a lightweight, agile bike that combines off-road motocross roots with street-oriented wheels, tires, and suspension for nimble urban and track riding.
-
C.
sport-touring motorcycle
A sport-touring motorcycle is a bike that blends the performance and agility of a sport motorcycle with the comfort, luggage capacity, and ergonomics needed for long-distance touring.
-
D.
cruiser motorcycle
A cruiser motorcycle is a low-slung, torque-focused bike designed for relaxed, upright riding and long-distance comfort, often featuring classic styling and a V-twin engine.
-
E.
motorcycle racer
A motorcycle racer is a professional or amateur athlete who competes in high-speed motorcycle competitions, skillfully maneuvering bikes on tracks or courses while balancing speed, control, and safety.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e523c19881909f9197037200dde6 |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:54 p.m.