Triple

T19951898
Position Surface form Disambiguated ID Type / Status
Subject Baku–Batumi oil route E479576 entity
Predicate instanceOf P0 FINISHED
Object oil transport corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: oil transport corridor
Context triple: [Baku–Batumi oil route, instanceOf, oil transport corridor]
  • A. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. crude oil pipeline system
    A crude oil pipeline system is an integrated network of pipes, pumps, valves, and control equipment designed to safely and efficiently transport unrefined petroleum from production sites to storage, processing, or export facilities.
  • E. interstate pipeline
    An interstate pipeline is a large-scale transportation system of pipes and related facilities that moves natural gas, oil, or other fluids across state boundaries under federal regulation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e522a17c819095165d4d24939fd8 completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:54 p.m.