Triple

T19930721
Position Surface form Disambiguated ID Type / Status
Subject Centro Direzionale, Perugia E479044 entity
Predicate instanceOf P0 FINISHED
Object building complex in Italy C399 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building complex in Italy
Context triple: [Centro Direzionale, Perugia, instanceOf, building complex in Italy]
  • A. building complex chosen
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • B. church building in Italy
    A church building in Italy is a religious structure, often historically and architecturally significant, designed for Christian worship and typically reflecting Italian artistic and cultural traditions.
  • C. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • D. real estate complex
    A real estate complex is a group of buildings and associated land, planned and developed as a unified property for residential, commercial, or mixed-use purposes.
  • E. building in Turin
    A building in Turin is a constructed structure within the city’s urban fabric, reflecting its historical, cultural, and architectural context while serving residential, commercial, institutional, or mixed-use functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e521855c8190b41871700afc8d6a completed April 10, 2026, 11:55 a.m.
Created at: April 10, 2026, 1:53 p.m.