Triple
T19923655
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | White Hart Lane railway cutting area |
E478866
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former railway cutting |
C25042
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former railway cutting Context triple: [White Hart Lane railway cutting area, instanceOf, former railway cutting]
-
A.
railway cutting
A railway cutting is an excavated trench or passage through high ground created to maintain a level or gently graded route for railway tracks.
-
B.
freight rail trench
A freight rail trench is a sunken, often open-air corridor designed to carry freight trains below street level to reduce surface congestion, noise, and conflicts with other transportation modes.
-
C.
former railway facility
chosen
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
-
D.
road–rail embankment
A road–rail embankment is an elevated earth or engineered structure designed to simultaneously support and separate both roadway and railway transport corridors above the surrounding ground level.
-
E.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e521855c8190b41871700afc8d6a |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:53 p.m.