Triple

T19923164
Position Surface form Disambiguated ID Type / Status
Subject Niagara Falls, Ontario E478850 entity
Predicate hasAttraction P105 FINISHED
Object Niagara Parks Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Niagara Parks Power Station | Statement: [Niagara Falls, Ontario, hasAttraction, Niagara Parks Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Niagara Parks Power Station
Context triple: [Niagara Falls, Ontario, hasAttraction, Niagara Parks Power Station]
  • A. Robert Moses Niagara Power Plant
    The Robert Moses Niagara Power Plant is a major hydroelectric generating station in New York that harnesses the flow of the Niagara River to produce electricity.
  • B. Niagara River hydropower system
    The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
  • C. Niagara District
    The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
  • D. Churchill Falls Generating Station
    Churchill Falls Generating Station is one of the world’s largest underground hydroelectric power plants, located on the Churchill River in Labrador, Canada.
  • E. Sault Ste. Marie Canal Powerhouse
    The Sault Ste. Marie Canal Powerhouse is a historic hydroelectric generating station that supplied power for the operation of the Sault Ste. Marie Canal in Ontario, Canada.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Niagara Parks Power Station
Target entity description: Niagara Parks Power Station is a historic hydroelectric power plant on the Canadian side of Niagara Falls that has been transformed into a public attraction showcasing the region’s power-generation heritage.
  • A. Robert Moses Niagara Power Plant
    The Robert Moses Niagara Power Plant is a major hydroelectric generating station in New York that harnesses the flow of the Niagara River to produce electricity.
  • B. Niagara River hydropower system
    The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
  • C. Niagara District
    The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
  • D. Churchill Falls Generating Station
    Churchill Falls Generating Station is one of the world’s largest underground hydroelectric power plants, located on the Churchill River in Labrador, Canada.
  • E. Sault Ste. Marie Canal Powerhouse
    The Sault Ste. Marie Canal Powerhouse is a historic hydroelectric generating station that supplied power for the operation of the Sault Ste. Marie Canal in Ontario, Canada.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e521855c8190b41871700afc8d6a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e659c7be948190a65a1c78ba68dff3 completed April 20, 2026, 4:52 p.m.
Created at: April 10, 2026, 1:53 p.m.