Triple

T199089
Position Surface form Disambiguated ID Type / Status
Subject Ford Transit E4061 entity
Predicate productionStatus P127 FINISHED
Object in production LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: in production | Statement: [Ford Transit, productionStatus, in production]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: productionStatus
Context triple: [Ford Transit, productionStatus, in production]
  • A. productionEnd
    Indicates that a production process, activity, or run has come to its completion or final stopping point.
  • B. produces
    Indicates that one entity creates, generates, or yields another entity as a result or output.
  • C. publicationStatus
    Indicates the current state or phase of a work within its publication lifecycle, such as draft, under review, published, or retired.
  • D. status chosen
    Indicates the current condition, state, or standing of an entity within a given context.
  • E. exportStatus
    Indicates the current state or outcome of an entity’s export process (e.g., pending, in progress, completed, or failed).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a254bca59881909a15e1496f1508c7 completed Feb. 28, 2026, 2:36 a.m.
NER Named-entity recognition batch_69a25bcc6dc88190b8c24b485588dfe4 completed Feb. 28, 2026, 3:06 a.m.
PD Predicate disambiguation batch_69a25b4886b48190b46fd2244648a098 completed Feb. 28, 2026, 3:04 a.m.
Created at: Feb. 28, 2026, 2:44 a.m.