Triple

T19899951
Position Surface form Disambiguated ID Type / Status
Subject I-10 Papago Freeway E478256 entity
Predicate connectsTo P845 FINISHED
Object I-17 Black Canyon Freeway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-17 Black Canyon Freeway | Statement: [I-10 Papago Freeway, connectsTo, I-17 Black Canyon Freeway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-17 Black Canyon Freeway
Context triple: [I-10 Papago Freeway, connectsTo, I-17 Black Canyon Freeway]
  • A. Red Mountain Freeway
    Red Mountain Freeway is a major segment of Arizona’s Loop 202 that serves as a key east–west transportation corridor through the Phoenix metropolitan area.
  • B. South Mountain Freeway
    South Mountain Freeway is a major segment of the Loop 202 beltway in the Phoenix, Arizona metropolitan area, designed to improve regional traffic flow and provide an alternative route around the city.
  • C. Agua Fria Freeway
    Agua Fria Freeway is a major segment of Arizona State Route 101 serving the northwestern Phoenix metropolitan area.
  • D. Riccheri Freeway
    Riccheri Freeway is a major highway in the Buenos Aires metropolitan area that serves as the primary road link between the city and Ministro Pistarini International Airport in Ezeiza.
  • E. I-210 Freeway
    The I-210 Freeway is a major east–west highway in Southern California that runs along the foothills of the San Gabriel Mountains, serving as a key commuter and bypass route around the Los Angeles metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-17 Black Canyon Freeway
Target entity description: I-17 Black Canyon Freeway is a major north–south Interstate highway in Arizona that runs through Phoenix and connects the city to northern destinations such as Flagstaff.
  • A. Red Mountain Freeway
    Red Mountain Freeway is a major segment of Arizona’s Loop 202 that serves as a key east–west transportation corridor through the Phoenix metropolitan area.
  • B. South Mountain Freeway
    South Mountain Freeway is a major segment of the Loop 202 beltway in the Phoenix, Arizona metropolitan area, designed to improve regional traffic flow and provide an alternative route around the city.
  • C. Agua Fria Freeway
    Agua Fria Freeway is a major segment of Arizona State Route 101 serving the northwestern Phoenix metropolitan area.
  • D. Riccheri Freeway
    Riccheri Freeway is a major highway in the Buenos Aires metropolitan area that serves as the primary road link between the city and Ministro Pistarini International Airport in Ezeiza.
  • E. I-210 Freeway
    The I-210 Freeway is a major east–west highway in Southern California that runs along the foothills of the San Gabriel Mountains, serving as a key commuter and bypass route around the Los Angeles metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e520682081909892916424699bd5 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65940cf8c8190b74e51635410e48a completed April 20, 2026, 4:50 p.m.
Created at: April 10, 2026, 1:52 p.m.