Triple
T19899248
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mount Takao |
E478236
|
entity |
| Predicate | hasHikingRoute |
P11758
|
FINISHED |
| Object | Trail 1 (Omotesandō Trail) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Trail 1 (Omotesandō Trail) | Statement: [Mount Takao, hasHikingRoute, Trail 1 (Omotesandō Trail)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Trail 1 (Omotesandō Trail) Context triple: [Mount Takao, hasHikingRoute, Trail 1 (Omotesandō Trail)]
-
A.
Gotemba Trail
Gotemba Trail is one of the main climbing routes on Japan’s Mount Fuji, known for its long, less crowded ascent across expansive volcanic ash slopes.
-
B.
Fujinomiya Trail
The Fujinomiya Trail is one of the primary climbing routes up Mount Fuji, known for its relatively short ascent and popular access from Shizuoka Prefecture.
-
C.
Yoshida Trail
The Yoshida Trail is the most popular and well-developed hiking route used by climbers ascending Japan’s Mount Fuji, especially from the Yamanashi Prefecture side.
-
D.
Omine Okugake trail
The Omine Okugake trail is a historic mountain pilgrimage route in Japan’s Kii Peninsula, famed for its rugged terrain and deep association with Shugendō ascetic practices.
-
E.
Subashiri Trail
The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Trail 1 (Omotesandō Trail) Target entity description: Trail 1 (Omotesandō Trail) is the most popular and accessible hiking route on Mount Takao, featuring paved paths, cultural sites, and scenic viewpoints suitable for most visitors.
-
A.
Gotemba Trail
Gotemba Trail is one of the main climbing routes on Japan’s Mount Fuji, known for its long, less crowded ascent across expansive volcanic ash slopes.
-
B.
Fujinomiya Trail
The Fujinomiya Trail is one of the primary climbing routes up Mount Fuji, known for its relatively short ascent and popular access from Shizuoka Prefecture.
-
C.
Yoshida Trail
The Yoshida Trail is the most popular and well-developed hiking route used by climbers ascending Japan’s Mount Fuji, especially from the Yamanashi Prefecture side.
-
D.
Omine Okugake trail
The Omine Okugake trail is a historic mountain pilgrimage route in Japan’s Kii Peninsula, famed for its rugged terrain and deep association with Shugendō ascetic practices.
-
E.
Subashiri Trail
The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e520682081909892916424699bd5 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e6593fbb348190afa7acf45af406ed |
completed | April 20, 2026, 4:50 p.m. |
Created at: April 10, 2026, 1:52 p.m.