Triple

T19899208
Position Surface form Disambiguated ID Type / Status
Subject Big Bend Dam E478235 entity
Predicate downstreamFrom P5956 FINISHED
Object Oahe Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oahe Dam | Statement: [Big Bend Dam, downstreamFrom, Oahe Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Oahe Dam
Context triple: [Big Bend Dam, downstreamFrom, Oahe Dam]
  • A. Oahe Dam chosen
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • B. Kajaki Dam
    Kajaki Dam is a major hydroelectric and irrigation dam on the Helmand River in southern Afghanistan, known both for its strategic importance and as the site of significant military activity during the Afghan conflict.
  • C. Yonki Dam
    Yonki Dam is a major hydroelectric dam in Papua New Guinea that supplies significant power to the country’s highlands region.
  • D. Shiroro Dam
    Shiroro Dam is a major hydroelectric power facility on the Kaduna River in Niger State, Nigeria, supplying electricity and supporting water management in the region.
  • E. Ohakuri Dam
    Ohakuri Dam is a major hydroelectric dam on New Zealand’s Waikato River, forming Lake Ohakuri and contributing significantly to the country’s renewable power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e520682081909892916424699bd5 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6593fbb348190afa7acf45af406ed completed April 20, 2026, 4:50 p.m.
Created at: April 10, 2026, 1:52 p.m.