Triple

T19877564
Position Surface form Disambiguated ID Type / Status
Subject California State Route 4 E477678 entity
Predicate hasSection P35 FINISHED
Object John Muir Parkway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: John Muir Parkway | Statement: [California State Route 4, hasSection, John Muir Parkway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: John Muir Parkway
Context triple: [California State Route 4, hasSection, John Muir Parkway]
  • A. Antelope Valley Freeway
    Antelope Valley Freeway is a major north–south highway in Southern California that connects Los Angeles to the Antelope Valley region and serves as a key commuter and regional transportation corridor.
  • B. Malibu Canyon Road
    Malibu Canyon Road is a scenic roadway in the Santa Monica Mountains of Southern California, known for its winding route through rugged canyons and proximity to hiking trails and natural preserves.
  • C. Santa Margarita Parkway
    Santa Margarita Parkway is a primary arterial road running through Rancho Santa Margarita in Orange County, California, serving as a key route for local traffic and access to nearby communities.
  • D. Mojave Road
    Mojave Road is a historic overland route crossing the Mojave Desert in the American Southwest, now popular as a remote off-road and overlanding trail.
  • E. Magic Mountain Parkway
    Magic Mountain Parkway is a major thoroughfare in Valencia, California, known for providing access to the Six Flags Magic Mountain theme park and surrounding commercial areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: John Muir Parkway
Target entity description: John Muir Parkway is a scenic segment of roadway in California named in honor of naturalist John Muir, providing access to parks and open spaces associated with his legacy.
  • A. Antelope Valley Freeway
    Antelope Valley Freeway is a major north–south highway in Southern California that connects Los Angeles to the Antelope Valley region and serves as a key commuter and regional transportation corridor.
  • B. Malibu Canyon Road
    Malibu Canyon Road is a scenic roadway in the Santa Monica Mountains of Southern California, known for its winding route through rugged canyons and proximity to hiking trails and natural preserves.
  • C. Santa Margarita Parkway
    Santa Margarita Parkway is a primary arterial road running through Rancho Santa Margarita in Orange County, California, serving as a key route for local traffic and access to nearby communities.
  • D. Mojave Road
    Mojave Road is a historic overland route crossing the Mojave Desert in the American Southwest, now popular as a remote off-road and overlanding trail.
  • E. Magic Mountain Parkway
    Magic Mountain Parkway is a major thoroughfare in Valencia, California, known for providing access to the Six Flags Magic Mountain theme park and surrounding commercial areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51f32b08190b3687f4f60353250 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e658dc8ce08190b005ad49924e5659 completed April 20, 2026, 4:48 p.m.
Created at: April 10, 2026, 1:52 p.m.