Triple

T19865657
Position Surface form Disambiguated ID Type / Status
Subject PA 51 E477382 entity
Predicate connectsTo P845 FINISHED
Object US 40
US 40 is a major historic east–west U.S. Highway that spans multiple states and roughly follows the route of the old National Road across the United States.
E1398475 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 40 | Statement: [PA 51, connectsTo, US 40]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: US 40
Context triple: [PA 51, connectsTo, US 40]
  • A. US 401
    US 401 is a U.S. highway running through North Carolina and South Carolina, connecting cities such as Fayetteville and Raleigh.
  • B. US 44
    US 44 is an east–west United States highway running through parts of New York, Connecticut, Rhode Island, and Massachusetts, connecting rural areas with several major cities in the Northeast.
  • C. US 41
    US 41 is a major north–south U.S. highway running from Miami, Florida, through the Midwest to the Upper Peninsula of Michigan near the Canadian border.
  • D. US 24
    US 24 is a major east–west U.S. Highway running through several Midwestern and Mountain states, connecting Colorado to Michigan.
  • E. US 80
    US 80 is a major east–west U.S. Highway that historically linked the Atlantic and Pacific coasts and now runs across the southern United States.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: US 40
Triple: [PA 51, connectsTo, US 40]
Generated description
US 40 is a major historic east–west U.S. Highway that spans multiple states and roughly follows the route of the old National Road across the United States.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: US 40
Target entity description: US 40 is a major historic east–west U.S. Highway that spans multiple states and roughly follows the route of the old National Road across the United States.
  • A. US 401
    US 401 is a U.S. highway running through North Carolina and South Carolina, connecting cities such as Fayetteville and Raleigh.
  • B. US 44
    US 44 is an east–west United States highway running through parts of New York, Connecticut, Rhode Island, and Massachusetts, connecting rural areas with several major cities in the Northeast.
  • C. US 41
    US 41 is a major north–south U.S. highway running from Miami, Florida, through the Midwest to the Upper Peninsula of Michigan near the Canadian border.
  • D. US 24
    US 24 is a major east–west U.S. Highway running through several Midwestern and Mountain states, connecting Colorado to Michigan.
  • E. US 80
    US 80 is a major east–west U.S. Highway that historically linked the Atlantic and Pacific coasts and now runs across the southern United States.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51e7d948190aedbcd6c30361c39 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e6589eb24081908715b683de1edc68 completed April 20, 2026, 4:47 p.m.
NED1 Entity disambiguation (via context triple) batch_6a07d44dbae4819095447a8c7914e369 completed May 16, 2026, 2:19 a.m.
NEDg Description generation batch_6a07d52ab9e88190a76a5208619e3f62 completed May 16, 2026, 2:23 a.m.
NED2 Entity disambiguation (via description) batch_6a07d5d982a88190b27218a8aea3d1ef completed May 16, 2026, 2:26 a.m.
Created at: April 10, 2026, 1:51 p.m.