Triple

T19833672
Position Surface form Disambiguated ID Type / Status
Subject Dunston Staiths E476526 entity
Predicate partOf P40 FINISHED
Object Tyne coal export infrastructure NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tyne coal export infrastructure | Statement: [Dunston Staiths, partOf, Tyne coal export infrastructure]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tyne coal export infrastructure
Context triple: [Dunston Staiths, partOf, Tyne coal export infrastructure]
  • A. Thames oil terminals
    Thames oil terminals are major petroleum handling and storage facilities along the River Thames that support the Port of London’s fuel import, export, and distribution operations.
  • B. Port of Newcastle upon Tyne
    The Port of Newcastle upon Tyne is a major commercial and maritime hub on England’s northeast coast, serving as a key gateway for trade and shipping between the UK and continental Europe.
  • C. Wark on Tyne
    Wark on Tyne is a small village in Northumberland, England, known for its rural setting and proximity to the River North Tyne.
  • D. Mersey Docks and Harbour system
    The Mersey Docks and Harbour system is the integrated network of docks, quays, and port facilities along the River Mersey that serves as the core maritime infrastructure for the Port of Liverpool.
  • E. Mostyn Docks
    Mostyn Docks is a historic maritime port and industrial facility on the Dee Estuary in North Wales, serving cargo, energy, and offshore industries.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tyne coal export infrastructure
Target entity description: Tyne coal export infrastructure refers to the historic network of staiths, railways, and riverside facilities along the River Tyne in northeast England that enabled large-scale loading and shipment of coal during the industrial era.
  • A. Thames oil terminals
    Thames oil terminals are major petroleum handling and storage facilities along the River Thames that support the Port of London’s fuel import, export, and distribution operations.
  • B. Port of Newcastle upon Tyne chosen
    The Port of Newcastle upon Tyne is a major commercial and maritime hub on England’s northeast coast, serving as a key gateway for trade and shipping between the UK and continental Europe.
  • C. Wark on Tyne
    Wark on Tyne is a small village in Northumberland, England, known for its rural setting and proximity to the River North Tyne.
  • D. Mersey Docks and Harbour system
    The Mersey Docks and Harbour system is the integrated network of docks, quays, and port facilities along the River Mersey that serves as the core maritime infrastructure for the Port of Liverpool.
  • E. Mostyn Docks
    Mostyn Docks is a historic maritime port and industrial facility on the Dee Estuary in North Wales, serving cargo, energy, and offshore industries.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51c7c188190b926f3a2a7b5f881 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e656d0347c8190b586c7fe01b61e97 completed April 20, 2026, 4:39 p.m.
Created at: April 10, 2026, 1:50 p.m.