Triple

T19825871
Position Surface form Disambiguated ID Type / Status
Subject Loboc E476323 entity
Predicate hasBodyOfWater P1778 FINISHED
Object Loboc River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Loboc River | Statement: [Loboc, hasBodyOfWater, Loboc River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Loboc River
Context triple: [Loboc, hasBodyOfWater, Loboc River]
  • A. Loboc River chosen
    Loboc River is a scenic waterway on Bohol Island in the Philippines, known for its river cruises, lush jungle surroundings, and cultural performances along its banks.
  • B. Bornoi River
    The Bornoi River is a regional river flowing through Assam in northeastern India, contributing to the local hydrology and agriculture of Darrang district.
  • C. Kahayan River
    The Kahayan River is a major river in Indonesian Borneo that flows through Central Kalimantan, serving as an important waterway for transportation, livelihoods, and regional ecology.
  • D. Ubagan River
    The Ubagan River is a transboundary river in Kazakhstan and Russia that flows through the steppe region before joining the Tobol River.
  • E. Pangpang River
    Pangpang River is a lesser-known waterway in the Philippines that serves as one of the tributaries feeding into the larger Bicol River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51c7c188190b926f3a2a7b5f881 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e656c9e7348190a569a40bd1fca6ba completed April 20, 2026, 4:39 p.m.
Created at: April 10, 2026, 1:50 p.m.