Triple
T19824967
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tinguiririca hydroelectric facilities |
E476298
|
entity |
| Predicate | typeOfHydropower |
P21222
|
FINISHED |
| Object | run-of-river hydropower |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: run-of-river hydropower | Statement: [Tinguiririca hydroelectric facilities, typeOfHydropower, run-of-river hydropower]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: typeOfHydropower Context triple: [Tinguiririca hydroelectric facilities, typeOfHydropower, run-of-river hydropower]
-
A.
hasHydropowerRoleIn
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
B.
powerplantType
chosen
Indicates the specific kind or category of power plant associated with an entity, based on how it generates energy.
-
C.
typeOfDamProject
Indicates that a given project is classified as a dam-related project (i.e., it is a project whose type is a dam project).
-
D.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
E.
hydroelectricStationCapacity
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51c7c188190b926f3a2a7b5f881 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e655017c188190ae9e17ae6b0eee05 |
completed | April 20, 2026, 4:32 p.m. |
| PD | Predicate disambiguation | batch_69e5305bda388190a23b7191768107b1 |
completed | April 19, 2026, 7:43 p.m. |
Created at: April 10, 2026, 1:50 p.m.