Triple

T19804901
Position Surface form Disambiguated ID Type / Status
Subject Sumter, South Carolina E475783 entity
Predicate majorHighway P385 FINISHED
Object South Carolina Highway 120 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Carolina Highway 120 | Statement: [Sumter, South Carolina, majorHighway, South Carolina Highway 120]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 120
Context triple: [Sumter, South Carolina, majorHighway, South Carolina Highway 120]
  • A. South Carolina Highway 121
    South Carolina Highway 121 is a primary state highway in South Carolina that runs generally north–south, connecting several towns and intersecting major routes across the state.
  • B. South Carolina Highway 125
    South Carolina Highway 125 is a state highway in South Carolina that serves as a key route connecting the town of Jackson to surrounding areas.
  • C. South Carolina Highway 160
    South Carolina Highway 160 is a primary state highway in northern South Carolina that connects the town of Fort Mill to the North Carolina state line and the greater Charlotte metropolitan area.
  • D. South Carolina Highway 113
    South Carolina Highway 113 is a primary state highway in South Carolina that serves as a regional connector route in and around the town of Wagener.
  • E. South Carolina Highway 102
    South Carolina Highway 102 is a primary state highway in South Carolina that connects several communities in the northeastern part of the state, including the Hartsville area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 120
Target entity description: South Carolina Highway 120 is a primary state highway serving the city of Sumter and its surrounding area in central South Carolina.
  • A. South Carolina Highway 121
    South Carolina Highway 121 is a primary state highway in South Carolina that runs generally north–south, connecting several towns and intersecting major routes across the state.
  • B. South Carolina Highway 125
    South Carolina Highway 125 is a state highway in South Carolina that serves as a key route connecting the town of Jackson to surrounding areas.
  • C. South Carolina Highway 160
    South Carolina Highway 160 is a primary state highway in northern South Carolina that connects the town of Fort Mill to the North Carolina state line and the greater Charlotte metropolitan area.
  • D. South Carolina Highway 113
    South Carolina Highway 113 is a primary state highway in South Carolina that serves as a regional connector route in and around the town of Wagener.
  • E. South Carolina Highway 102
    South Carolina Highway 102 is a primary state highway in South Carolina that connects several communities in the northeastern part of the state, including the Hartsville area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51bc4208190a1c57d8c5d1b15e4 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e65427546c819082c8eb0d63e3f5fe completed April 20, 2026, 4:28 p.m.
Created at: April 10, 2026, 1:49 p.m.