Triple
T1979803
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NACS (North American Charging Standard) |
E42998
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | DC fast charging connector |
C12007
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: DC fast charging connector Context triple: [NACS (North American Charging Standard), instanceOf, DC fast charging connector]
-
A.
fast charging network
A fast charging network is an interconnected system of high-power electric vehicle charging stations designed to rapidly recharge EV batteries across wide geographic areas.
-
B.
automotive terminal
An automotive terminal is an electrical connector component used in vehicles to securely join wires to each other or to devices within the automotive electrical system.
-
C.
electric vehicle charging network
An electric vehicle charging network is a coordinated system of charging stations, infrastructure, and management services that supplies power to electric vehicles across multiple locations.
-
D.
power delivery specification
A power delivery specification defines the technical requirements, limits, and conditions under which electrical power must be supplied, distributed, and regulated within a system or between interconnected systems.
-
E.
network connector
A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88713ddc88190a969715658ebe7a8 |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.