Triple

T1979802
Position Surface form Disambiguated ID Type / Status
Subject NACS (North American Charging Standard) E42998 entity
Predicate instanceOf P0 FINISHED
Object electric vehicle charging connector standard C5735 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric vehicle charging connector standard
Context triple: [NACS (North American Charging Standard), instanceOf, electric vehicle charging connector standard]
  • A. electric vehicle charging network
    An electric vehicle charging network is a coordinated system of charging stations, infrastructure, and management services that supplies power to electric vehicles across multiple locations.
  • B. fast charging network
    A fast charging network is an interconnected system of high-power electric vehicle charging stations designed to rapidly recharge EV batteries across wide geographic areas.
  • C. automotive terminal
    An automotive terminal is an electrical connector component used in vehicles to securely join wires to each other or to devices within the automotive electrical system.
  • D. electric semi-truck
    An electric semi-truck is a heavy-duty commercial vehicle powered solely by electric batteries and motors, designed to haul large freight loads with reduced emissions and operating costs compared to diesel trucks.
  • E. transportation standard chosen
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88713ddc88190a969715658ebe7a8 completed March 4, 2026, 7:25 p.m.
Created at: March 4, 2026, 7:36 p.m.