Triple
T19797732
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Frankel-Baruch-Viertel-Routh Group |
E475586
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Broadway producing partnership |
C34296
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Broadway producing partnership Context triple: [The Frankel-Baruch-Viertel-Routh Group, instanceOf, Broadway producing partnership]
-
A.
Broadway theater producer
A Broadway theater producer is a professional who secures financing, assembles creative and technical teams, oversees production logistics, and manages the business and artistic aspects of bringing a stage show to Broadway audiences.
-
B.
musical theatre partnership
chosen
A musical theatre partnership is a collaborative relationship between individuals or organizations that combine creative, financial, and production resources to develop, stage, and promote musical theatre works.
-
C.
Broadway revival production
A Broadway revival production is a new staging of a previously produced Broadway show, often featuring updated direction, design, and casting while retaining the original work’s core script and score.
-
D.
Broadway musical
A Broadway musical is a large-scale theatrical production that combines spoken dialogue, songs, and dance, performed in professional theaters in New York City's Broadway district.
-
E.
West End musical production
A West End musical production is a large-scale, professionally staged musical theatre show performed in one of London’s major commercial theatres, typically featuring high production values, extended runs, and broad public appeal.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51b014081908b263e167370529a |
completed | April 10, 2026, 11:55 a.m. |
Created at: April 10, 2026, 1:49 p.m.