Triple
T1979660
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arabsat-6A |
E42995
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | geostationary communications satellite |
C12006
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: geostationary communications satellite Context triple: [Arabsat-6A, instanceOf, geostationary communications satellite]
-
A.
space communication network
A space communication network is an interconnected system of ground stations, satellites, and relay nodes that enables the reliable transmission, routing, and reception of data across space and between space-based and terrestrial assets.
-
B.
satellite program
A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
-
C.
polar-orbiting weather satellite program
A polar-orbiting weather satellite program is a coordinated system of satellites in near-polar orbits that provide global, high-resolution observations of atmospheric, oceanic, and surface conditions for weather forecasting and climate monitoring.
-
D.
Global Navigation Satellite System
A Global Navigation Satellite System is a satellite-based infrastructure that provides continuous, worldwide positioning, navigation, and timing services to receivers on or near Earth’s surface.
-
E.
satellite pyramid
A satellite pyramid is a smaller, secondary pyramid structure built near a main pyramid, typically serving as a subsidiary tomb or ritual monument associated with the primary complex.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88713ddc88190a969715658ebe7a8 |
completed | March 4, 2026, 7:25 p.m. |
Created at: March 4, 2026, 7:36 p.m.