Triple

T19793695
Position Surface form Disambiguated ID Type / Status
Subject Toktogul Reservoir E475483 entity
Predicate downstreamFacility P137350 FINISHED
Object Uch-Kurgan Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uch-Kurgan Hydroelectric Power Plant | Statement: [Toktogul Reservoir, downstreamFacility, Uch-Kurgan Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Uch-Kurgan Hydroelectric Power Plant
Context triple: [Toktogul Reservoir, downstreamFacility, Uch-Kurgan Hydroelectric Power Plant]
  • A. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • B. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • C. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • D. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • E. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Uch-Kurgan Hydroelectric Power Plant
Target entity description: Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
  • A. Khrami II Hydroelectric Power Plant
    Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • B. Kara-Köl Hydroelectric Power Station
    Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
  • C. Shamaldy-Sai Hydroelectric Power Plant
    The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
  • D. Zhinvali Hydroelectric Power Plant
    The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
  • E. Khrami I Hydroelectric Power Plant
    Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e51b014081908b263e167370529a completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e653c4a8a88190afc2f2cd1ebbbe1e completed April 20, 2026, 4:26 p.m.
Created at: April 10, 2026, 1:49 p.m.