Triple
T19793695
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Toktogul Reservoir |
E475483
|
entity |
| Predicate | downstreamFacility |
P137350
|
FINISHED |
| Object | Uch-Kurgan Hydroelectric Power Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uch-Kurgan Hydroelectric Power Plant | Statement: [Toktogul Reservoir, downstreamFacility, Uch-Kurgan Hydroelectric Power Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Uch-Kurgan Hydroelectric Power Plant Context triple: [Toktogul Reservoir, downstreamFacility, Uch-Kurgan Hydroelectric Power Plant]
-
A.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
B.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
-
C.
Shamaldy-Sai Hydroelectric Power Plant
The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
-
D.
Zhinvali Hydroelectric Power Plant
The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
-
E.
Khrami I Hydroelectric Power Plant
Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Uch-Kurgan Hydroelectric Power Plant Target entity description: Uch-Kurgan Hydroelectric Power Plant is a Soviet-era hydroelectric station on the Naryn River in Kyrgyzstan that forms part of the country’s major cascade of power-generating dams.
-
A.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
-
B.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
-
C.
Shamaldy-Sai Hydroelectric Power Plant
The Shamaldy-Sai Hydroelectric Power Plant is a hydroelectric station in Kyrgyzstan that generates electricity using water flows regulated by the Toktogul Reservoir on the Naryn River.
-
D.
Zhinvali Hydroelectric Power Plant
The Zhinvali Hydroelectric Power Plant is a hydroelectric facility in Georgia that generates electricity using water impounded by the Zhinvali Dam on the Aragvi River.
-
E.
Khrami I Hydroelectric Power Plant
Khrami I Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e51b014081908b263e167370529a |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e653c4a8a88190afc2f2cd1ebbbe1e |
completed | April 20, 2026, 4:26 p.m. |
Created at: April 10, 2026, 1:49 p.m.